Identity | Elevation : Wall MR-0125 ; 1 element |
Provenance | Sarno, Mura d'Arce (aqueduct) |
Chronological Phase(s) | Renovation 2 |
Description | Phase de reconstruction de l'aqueduc avec parements en briques. |
Type of technique | 12-05-004 |
Morphological type | In plan : With parallel sides. In section : With parallel sides |
Function | Load-bearing element |
Cross section | Faced (1 wall facing) ; With internal core ; Wall facings joined with the core ; Max. thickness : 40 cm ; Thickness of core/total ratio : 2/3 |
Materials | Terracotta - Binder (lime and sand mortar) |
Architectural terracottas | Shape : Rectangular bricks Finishing : Whole - Resized Average dimensions (cm) : Length : 22,4 ; Height : 3,1 ; Unit of 5 courses : 24,5 |
Courses | Arrangement of materials : Horizontal courses |
Quoins | Relationship to the wall facing : Same technique ; Same material |
Joints | Thickness : 1-2 cm |
Comments | Matériaux : briques avec pâte de type vésuvien (?). |
Author(s) of record | Hélène Dessales, Francesca Filocamo |
Date of record | 23/07/2016 |
Electronic edition | Agnès Tricoche (labex TransferS - Pôle Humanités Numériques, ENS) |
URI | https://acor.huma-num.fr/MR-0125/en |
Handle | hdl:10670/1.1afrwx |